West Gate Tunnel Project

Timeline

September 2024 – December 2024

Location

Footscray, Victoria

Completed

December 2024

Services

Local Site Establishment
Control Transfer & Construction Setout (ground level & subterranean)
As-Built Surveys & Reporting

Smith Land Consulting was engaged in September 2024 to deliver comprehensive surveying services for a critical component of the West Gate Tunnel Project – one of Victoria’s most significant infrastructure developments.

Our role involved connecting to and extending the existing site control network to ensure precision and reliability across a highly localised section of the project. Leveraging our specialist expertise, we provided end-to-end surveying support including control establishment, set-out and verification works prior to tunnel drives, detailed post-drive as-built surveys, and comprehensive reporting.

Survey control transfer in large-scale infrastructure projects presents a range of complex challenges. With deep industry experience and a commitment to technical excellence, the Smith Land Consulting team is well-equipped to meet these demands and deliver accurate, dependable results that support the successful delivery of vital public infrastructure.